Density Test Report

Date :06/17/2026
Project No :2025C216
Client Company :Artisan
Arrival Time :06/17/2026 07:30
Onsite Hours :9:00
Name of the Project :NW (Lots) Unit 4 PH 1A & 1B
Project Location :Dallas
Weather :cloudy
Departure Time :06/17/2026 16:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/17/2026 1 14.1 104.5 2025-035 SP 107.8 13.0 96.9 95 D6938 Pass
Location : Nature Walk Parkway STA 52+25, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
06/17/2026 2 14.8 104.8 2025-035 SP 107.8 13.0 97.2 95 D6938 Pass
Location : Nature Walk Parkway STA 52+80, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
06/17/2026 3 15.2 101.7 2025-033 SP 104.0 16.2 97.8 95 D6938 Pass
Location : Nature Walk Parkway STA 53+30, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :91643
06/17/2026 4 15.9 102.2 2025-033 SP 104.0 16.2 98.3 95 D6938 Pass
Location : Nature Walk Parkway STA 54+00, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, June 17, 2026
Reviewer Name / DateKenneth Mosman, June 26, 2026