- Home
- Daily Field Report Report ID: 95448
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
On the above date our representative was on site to observe the contractor performed subbase and subgrade preparation for the deceleration lane and turn in entrance lane. The contractor clipped the subgrade at the entrance lane an additional -6″ as recommended, removing saturated in-place soils. The clipped area was replaced with additional base stone. The contractor also appeared to cut a power line going to the light pole that wasn’t repaired. It was recommended to add water to the subbase stone added today.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Sub grade clipped -6" at entrance drive

Sub grade probed to determine -6" clip


Sub base prep. at deceleration lane