Density Test Report

Date :06/24/2026
Project No :2026C125
Client Company :Lewis Contracting
Arrival Time :06/24/2026 08:00
Onsite Hours :07:00
Name of the Project :Pittman Park - Garibaldi St. Stormwater
Project Location :Atlanta
Weather :sunny
Departure Time :06/24/2026 15:00
ASEC Technician Name :Sean Willett

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/24/2026 1 26.6 97.1 2026-076 104.4 20.1 93.0 98 D6938 Fail
Location : Existing to d-3 roadway, Elv/Depth :at finished grade
Comment : In-situ moisture contents way above optimum. Recommend scarifying, aeration and recompaction. Contractor filled approximately 4 to 6 feet in this area without any compaction testing. Gauge Serial No. :77-19952
06/24/2026 2 23.6 86.0 2026-076 104.4 20.1 82.4 98 D6938 Fail
Location : Existing to d-3 roadway, Elv/Depth :at finished grade
Comment : In-situ moisture contents above optimum moisture content. Gauge Serial No. :77-19952
Technician Signature / DateSean Willett, June 24, 2026
Reviewer Name / DateKenneth Mosman, July 06, 2026