Skip to content

Density Test Report

Date :06/30/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :06/30/2026 12:00
Onsite Hours :03:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :06/30/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/30/2026 1 16.1 96.1 Field proctor #6 98.0 17.2 98.1 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/30/2026 2 17.6 95.5 Field proctor #6 98.0 17.2 97.4 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/30/2026 3 13.2 103.3 2025-035 SP 107.8 13.0 95.8 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/30/2026 4 14.1 104.6 2025-035 SP 107.8 13.0 97.0 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, June 30, 2026
Reviewer Name / DateKenneth Mosman, July 08, 2026