Density Test Report

Date :06/29/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :06/29/2026 14:00
Onsite Hours :02:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :06/29/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/29/2026 1 14.2 94.2 Field proctor #6 98.0 17.2 96.1 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2026 2 17.1 93.8 Field proctor #6 98.0 17.2 95.7 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2026 3 15.2 107.5 2025-035 SP 107.8 13.0 99.7 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
06/29/2026 4 14.7 103.7 2025-035 SP 107.8 13.0 96.2 95 D6938 Pass
Location : Future lots, Elv/Depth :10 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, June 29, 2026
Reviewer Name / DateKenneth Mosman, July 07, 2026