Skip to content

Density Test Report

Date :07/02/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :07/02/2026 12:00
Onsite Hours :03:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/02/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/02/2026 1 16.7 102.2 2025-033 SP 104.0 16.2 98.3 98 D6938 Pass
Location : Lot #60, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/02/2026 2 17.2 103.1 2025-033 SP 104.0 16.2 99.1 98 D6938 Pass
Location : Lot #60, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/02/2026 3 15.4 102.8 2025-033 SP 104.0 16.2 98.8 98 D6938 Pass
Location : Lot #61, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/02/2026 4 16.4 102.5 2025-033 SP 104.0 16.2 98.6 98 D6938 Pass
Location : Lot #61, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/02/2026 5 15.9 94.1 Field proctor #6 98.0 17.2 96.0 95 D6938 Pass
Location : Future lots, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :38069
07/02/2026 6 16.2 95.0 Field proctor #6 98.0 17.2 96.9 95 D6938 Pass
Location : Future lots, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :38069
07/02/2026 7 18.2 97.1 2025-031 SP 101.0 20.7 96.1 95 D6938 Pass
Location : Future lots, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 2, 2026
Reviewer Name / DateKenneth Mosman, July 08, 2026