- Home
- Daily Field Report Report ID: 95848
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.
Our ASEC representative was on site to observe the contractor and for the observation/testing of the placement of fill/backfill. The city officials canceled the concrete pour again today due to not having density testing results from underneath the pipeline. The trench was inspected and probe rod tested, but density testing was not performed as these soils are residual. The contractors requested a sample of soil be taken to the lab for a proctor in the roadway. They plan to excavate test pits next to the pipeline to test the soil under the pipe.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

