Skip to content

Density Test Report

Date :07/06/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/06/2026 15:00
Onsite Hours :02:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/06/2026 17:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/06/2026 1 18.3 99.6 2025-031 SP 101.0 20.7 98.6 98 D6938 Pass
Location : Lot #27, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/06/2026 2 21.4 100.6 2025-031 SP 101.0 20.7 99.6 98 D6938 Pass
Location : Lot #27, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
07/06/2026 3 18.3 106.3 2025-036 SP 107.0 18.5 99.3 98 D6938 Pass
Location : Lot #26, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 6, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026