Density Test Report

Date :07/09/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :07/09/2026 08:00
Onsite Hours :04:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/09/2026 12:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/09/2026 1 15 101.2 2025-033 SP 104.0 16.2 97.3 95 D6938 Pass
Location : Lot #29, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 2 16.4 100.7 2025-033 SP 104.0 16.2 96.8 95 D6938 Pass
Location : Lot #29, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 3 13.9 103.0 2025-035 SP 107.8 13.0 95.5 95 D6938 Pass
Location : Lot #30, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 4 16.1 99.2 2025-033 SP 104.0 16.2 95.4 95 D6938 Pass
Location : Lot #30, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 5 19.8 97.0 Field proctor #6 98.0 17.2 99.0 98 D6938 Pass
Location : Manhole 19.1-19.2, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 6 20.1 97.2 Field proctor #6 98.0 17.2 99.2 98 D6938 Pass
Location : Manhole 19.1-19.2, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 7 20.1 97.3 Field proctor #6 98.0 17.2 99.3 98 D6938 Pass
Location : Manhole 19.1-19.2, Elv/Depth :at finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 9, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026