Density Test Report

Date :07/09/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :07/09/2026 12:00
Onsite Hours :03:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/09/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/09/2026 1 16.1 92.6 Field proctor #6 98.0 17.2 94.5 95 D6938 Fail
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : The affected area was re-compacted and requires follow-up density testing. Gauge Serial No. :38069
07/09/2026 2 15.8 91.8 Field proctor #6 98.0 17.2 93.7 95 D6938 Fail
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : The affected area was re-compacted and requires follow-up density testing. Gauge Serial No. :38069
07/09/2026 3 15.7 93.6 Field proctor #6 98.0 17.2 95.5 95 D6938 Pass
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/09/2026 4 17.1 92.1 Field proctor #6 98.0 17.2 94.0 95 D6938 Fail
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : The affected area was re-compacted and requires follow-up density testing. Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 9, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026