Skip to content

Density Test Report

Date :07/10/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :07/10/2026 11:00
Onsite Hours :04:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :07/10/2026 15:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/10/2026 1 20.1 94.5 Field proctor #6 98.0 17.2 96.4 95 D6938 Pass
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 2 19.1 99.4 2025-033 SP 104.0 16.2 95.6 95 D6938 Pass
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 3 18.1 100.7 2025-033 SP 104.0 16.2 96.8 95 D6938 Pass
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 4 18.7 100.5 2025-033 SP 104.0 16.2 96.6 95 D6938 Pass
Location : Future lots, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 5 21.3 99.5 2025-031 SP 101.0 20.7 98.5 98 D6938 Pass
Location : Roadway, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 6 25.4 90.7 2025-032 SP 94.9 25.0 95.6 98 D6938 Fail
Location : Roadway, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 7 19.2 97.5 2025-031 SP 101.0 20.7 96.5 98 D6938 Fail
Location : Roadway, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
07/10/2026 8 20.1 99.3 2025-031 SP 101.0 20.7 98.3 98 D6938 Pass
Location : Roadway, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :38069
Technician Signature / DateSamara Simha Reddy Kandi, July 10, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026