Skip to content

Daily Field Report

Date :07/23/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :07/23/2026 08:00
Onsite Hours :06:00
Name of the Project :Naturewalk PHASE 3 (PH 2 Extension) Lots
Project Location :Dallas
Weather :Sunny
Departure Time :07/23/2026 14:00
ASEC Technician Name :Sean Willett

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials
submittals. The following observations were observed on site this day.

Our ASEC representative was on site to observe the contractor and for the observation/testing of the placement of fill/backfill. The contractor continued placing soil lifts of approximately 8 to 12 inches thick across the lots located in the cul-de-sac of phase 3a. Lifts were compacted with a sheep-foot roller. Density testing will be performed on the final grade of the lots due to the contractor being with-in 1 foot from final grade.

ASEC picked up the concrete cylinders from the bridge and transferred to the lab for curing.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateSean Willett, July 23, 2026
Reviewer Name / DateKenneth Mosman, July 30, 2026