Density Test Report

Date :08/05/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :08/05/2026 12:30
Onsite Hours :04:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :cloudy
Departure Time :08/05/2026 17:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/05/2026 1 17.2 94.5 Field proctor #6 98.0 17.2 96.4 95 D6938 Pass
Location : Fill placement at west side bridge abutment, Elv/Depth :10' below sanitary sewer opening
Comment : Gauge Serial No. :91643
08/05/2026 2 18.2 95.3 Field proctor #6 98.0 17.2 97.2 95 D6938 Pass
Location : Fill placement at west side bridge abutment, Elv/Depth :10 feet below sanitary sewer location
Comment : Gauge Serial No. :91643
08/05/2026 3 18.8 96.8 Field proctor #6 98.0 17.2 98.8 95 D6938 Pass
Location : Fill placement at west side bridge abutment, Elv/Depth :10 feet below sanitary sewer location
Comment : Gauge Serial No. :91643
08/05/2026 4 14.7 102.3 2025-033 SP 104.0 16.2 98.4 95 D6938 Pass
Location : Fill placement at west side bridge abutment, Elv/Depth :10 feet below sanitary sewer location
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 5, 2026
Reviewer Name / DateKenneth Mosman, August 11, 2026