Skip to content

Density Test Report

Date :08/11/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :08/11/2026 11:30
Onsite Hours :06:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :cloudy
Departure Time :08/11/2026 18:00
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/11/2026 1 14.6 101.5 2025-033 SP 104.0 16.2 97.6 95 D6938 Pass
Location : Retest from 8/10/26, Elv/Depth :7 feet below sanitary sewer installation
Comment : Gauge Serial No. :91643
08/11/2026 2 14.9 101.3 2025-033 SP 104.0 16.2 97.4 95 D6938 Pass
Location : Retest from 8/10/26, Elv/Depth :7 feet below sanitary sewer installation
Comment : Gauge Serial No. :91643
08/11/2026 3 21.7 91.8 2025-032 SP 94.9 25.0 96.7 95 D6938 Pass
Location : Retest from 8/10/26, Elv/Depth :6.5 feet below sanitary sewer installation
Comment : Gauge Serial No. :91643
08/11/2026 5 22.7 92.3 2025-032 SP 94.9 25.0 97.3 95 D6938 Pass
Location : Backfill at west side bridge abutment , Elv/Depth :5 feet below sanitary sewer installation
Comment : Gauge Serial No. :91643
08/11/2026 6 14.9 101.3 2025-033 SP 104.0 16.2 97.4 95 D6938 Pass
Location : Backfill at west side bridge abutment, Elv/Depth :5 feet below sanitary sewer installation
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 11, 2026
Reviewer Name / DateKenneth Mosman, August 19, 2026