- Home
- Density Test Report Report ID: 97001
- Edit Download Report
Density Test Report
Date :08/18/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :08/18/2026 14:00
Onsite Hours :03:30
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :sunny
Departure Time :08/18/2026 17:30
ASEC Technician Name :
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 08/18/2026 | 1 | 21.3 | 91.4 | 2025-032 SP | 94.9 | 25.0 | 96.3 | 95 | D6938 | Pass |
| Location : | Backfill at bridge abutment west side, Elv/Depth :-3' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 08/18/2026 | 2 | 22.7 | 93.4 | 2025-032 SP | 94.9 | 25.0 | 98.4 | 95 | D6938 | Pass |
| Location : | Backfill at bridge abutment west side , Elv/Depth :-3' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 08/18/2026 | 3 | 13.8 | 100.7 | 2025-033 SP | 104.0 | 16.2 | 96.8 | 95 | D6938 | Pass |
| Location : | Backfill at bridge abutment west side, Elv/Depth :-3' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, August 18, 2026
