Density Test Report

Date :08/27/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :08/27/2026 07:30
Onsite Hours :08:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :08/27/2026 15:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/27/2026 1 16.5 104.0 2025-036 SP 107.0 18.5 97.2 95 D6938 Pass
Location : Roadway fill between B6.2 ST G1,B6 ST JB and B4 ST JB, Elv/Depth :6 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 2 15.9 104.1 2025-035 SP 107.8 13.0 96.6 95 D6938 Pass
Location : Roadway fill between B6.2 ST G1,B6 ST JB and B4 ST JB, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 3 12.9 103.0 2025-035 SP 107.8 13.0 95.5 95 D6938 Pass
Location : Roadway fill between B6.2 ST G1,B6 ST JB and B4 ST JB, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 4 14.2 113.7 2025-033 SP 104.0 16.2 95.8 95 D6938 Pass
Location : 36" RCP storm at Pond A OCS, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 5 14.0 99.0 2025-033 SP 104.0 16.2 95.2 95 D6938 Pass
Location : 36" RCP storm at Pond A OCS, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 6 21.3 111.6 2025-032 SP 94.9 25.0 96.9 95 D6938 Pass
Location : 36" RCP storm at Pond A OCS, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
08/27/2026 7 21.6 91.2 2025-032 SP 94.9 25.0 96.1 95 D6938 Pass
Location : 36" RCP storm at Pond A OCS, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, August 27, 2026
Reviewer Name / DateKenneth Mosman, September 01, 2026