Skip to content

Density Test Report

Date :08/31/2026
Project No :2025C244
Client Company :McCallan Group
Arrival Time :08/31/2026 10:00
Onsite Hours :06:00
Name of the Project :Cassville Rd (Crossroads Sub), Additional Services
Project Location :Cartersville
Weather :sunny
Departure Time :08/31/2026 16:00
ASEC Technician Name :Samara Simha Reddy Kandi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/31/2026 1 15.7 108.7 2025-051 106.4 19.3 102.2 98 D6938 Pass
Location : Roadway between Lots #39 and 40, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :92514
08/31/2026 2 16.5 128.3 2025-051 106.4 19.3 103.5 98 D6938 Pass
Location : Roadway between Lots #39 and 40, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :92514
Technician Signature / DateSamara Simha Reddy Kandi, August 31, 2026
Reviewer Name / DateKenneth Mosman, September 16, 2026