Daily Field Report

Date :09/03/2026
Project No :2023C206
Client Company :CWM-JVTECH
Arrival Time :09/03/2026
Onsite Hours :
Name of the Project :Concourse D Widening
Project Location :HJAIA
Weather :sunny
Departure Time :09/03/2026
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes,and materials submittals. The following observations were observed on site this day.

A request was made to straightedge the GAB (Graded Aggregate Base) placement in Lane 3, located in the middle of Concourse D (see photos). Parties onsite included Holder, CW Matthews, Kelley Construction, CERN, ATLNext, and others.

Lane 3 was checked using a straightedge parallel to the lane throughout the entire section. The lane was also checked perpendicular to the lane at each panel joint and again at the center of each panel. A string line was placed at the end of Lane 3 to verify the depth.

Following the inspection, all parties present agreed that the GAB (Graded Aggregate Base)  placement was acceptable in regards to straight edge.

No further observations were made.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Straight edge

signed approval from AtlNext,Holder,QA

Location Con D

Location Con D

Technician Signature / DateRussell Hendrix, September 3, 2026
Reviewer Name / DateKenneth Mosman, September 16, 2026