- Home
- Density Test Report Report ID: 97453
- Edit Download Report
Density Test Report
Date :09/03/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/03/2026 12:30
Onsite Hours :04:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :sunny
Departure Time :09/03/2026 16:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/03/2026 | 1 | 13.7 | 100.8 | 2025-033 SP | 104.0 | 16.2 | 96.9 | 95 | D6938 | Pass |
| Location : | Building Lots # 15 and 16, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/03/2026 | 2 | 14.1 | 99.8 | 2025-033 SP | 104.0 | 16.2 | 96.0 | 95 | D6938 | Pass |
| Location : | Building Lots # 15 and 16, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/03/2026 | 3 | 14.4 | 103.1 | 2025-035 SP | 107.8 | 13.0 | 95.6 | 95 | D6938 | Pass |
| Location : | Building Lots # 15 and 16, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/03/2026 | 4 | 12.8 | 102.5 | 2025-035 SP | 107.8 | 13.0 | 95.1 | 95 | D6938 | Pass |
| Location : | Building Lots # 15 and 16, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, September 3, 2026
Reviewer Name / DateKenneth Mosman, September 16, 2026
