Density Test Report

Date :09/14/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/14/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/14/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/14/2026 1 11.6 104.2 2025-035 SP 107.8 13.0 96.7 95 D6938 Pass
Location : Building Lot #25, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :91643
09/14/2026 2 10.7 111.4 2025-035 SP 107.8 13.0 93.3 95 D6938 Fail
Location : Building Lot #25, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :91643
09/14/2026 3 11.1 115.6 2025-035 SP 107.8 13.0 96.6 95 D6938 Pass
Location : Retest #2, Elv/Depth :9 feet below finished grade
Comment : Gauge Serial No. :91643
09/14/2026 4 11.0 104.8 2025-035 SP 107.8 13.0 97.2 95 D6938 Pass
Location : Building Lot #24, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91643
09/14/2026 5 12.1 118.2 2025-035 SP 107.8 13.0 97.8 95 D6938 Pass
Location : Building Lot #24, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91643
09/14/2026 6 12.4 104.7 2025-035 SP 107.8 13.0 97.1 95 D6938 Pass
Location : Building Lot #24, Elv/Depth :8 feet below finished grade
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, September 14, 2026
Reviewer Name / DateKenneth Mosman, September 16, 2026