- Home
- Density Test Report Report ID: 97789
- Edit Download Report
Density Test Report
Date :09/21/2026
Project No :2026C101
Client Company :Artisan
Arrival Time :09/21/2026 07:30
Onsite Hours :10:00
Name of the Project :Seven Hills PHASE 13, UNIT 3 Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/21/2026 17:30
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 09/21/2026 | 1 | 13.4 | 100.3 | 2025-033 SP | 104.0 | 16.2 | 96.4 | 95 | D6938 | Pass |
| Location : | Roadway between S.S. manhole Z 18 and Z 20, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 2 | 13.8 | 100.5 | 2025-033 SP | 104.0 | 16.2 | 96.6 | 95 | D6938 | Pass |
| Location : | Roadway between S.S. manhole Z 18 and Z 20, Elv/Depth :8 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 3 | 21.3 | 90.8 | 2025-032 SP | 94.9 | 25.0 | 95.7 | 95 | D6938 | Pass |
| Location : | Roadway between S.S. manhole Z 18 and Z 20, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 4 | 12.9 | 104.3 | 2025-035 SP | 107.8 | 13.0 | 96.8 | 95 | D6938 | Pass |
| Location : | Roadway between S.S. manhole Z 18 and Z 20, Elv/Depth :6 feet below finished grade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 5 | 13.3 | 101.9 | 2025-033 SP | 104.0 | 16.2 | 98.0 | 98 | D6938 | Fail |
| Location : | Building Lot #10, Elv/Depth :at finished subgrade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 6 | 12.8 | 102.4 | 2025-033 SP | 104.0 | 16.2 | 98.5 | 98 | D6938 | Pass |
| Location : | Building Lot #10, Elv/Depth :at finished subgrade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 7 | 14.1 | 101.8 | 2025-033 SP | 104.0 | 16.2 | 97.9 | 95 | D6938 | Pass |
| Location : | Building Lot #15, Elv/Depth :2 feet below finished subgrade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 09/21/2026 | 8 | 13.3 | 103.9 | 2025-035 SP | 107.8 | 13.0 | 96.4 | 95 | D6938 | Pass |
| Location : | Building Lot #15, Elv/Depth :2 feet below finished subgrade | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, September 21, 2026
Reviewer Name / DateKenneth Mosman, September 23, 2026