Daily Field Report

Date :09/28/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :09/28/2026 07:30
Onsite Hours :11:00
Name of the Project :Naturewalk PHASE 3, UNIT 4 (formerly called PH 2 Extension) Lots
Project Location :Dallas
Weather :Sunny
Departure Time :09/28/2026 18:30
ASEC Technician Name :Clyde Smith

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

On the above date our representative observed the grading contractor Thompson continue fill placement at Unit 4 Phase 3 building lots. The writer performed density tests using a Troxler Nuclear gauge model 3430, serial no. 91643. Compaction results met job specifications.

The writer also observed the grading contractor continue fine grading at building Lots #10 thru 15 and placing rock fill at borrow pit #2 south of building Lot #24. Density tests were also performed at the building lots.

The paving contractor NWGP continued subgrade preparation at the Nature Walk Parkway roundabout.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Subgrade prep. at roundabout

Density tests at building lots 10 thru 15

Subgrade prep. at roundabout

Density tests at Unit 4 phase 3

Compacting efforts using off road dump truck at Unit 4 phase 3

Technician Signature / DateClyde Smith, September 28, 2026
Reviewer Name / DateKenneth Mosman, October 21, 2026