Concrete Test Report

Date :10/08/2026
Project No :2025C214
Client Company :Artisan
Arrival Time :10/08/2026 06:30
Onsite Hours :04:00
Name of the Project :NW Unit 4 BRIDGE (Materials Testing)
Project Location :Dallas
Weather :Sunny
Departure Time :10/08/2026 10:30
ASEC Technician Name :Clyde Smith

Concrete Placement Information

Location(S): N/A
Testing: 1 Set of concrete specimens (6 per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The specimen will remain on site for the initial 24-48 hrs curing.
Compliance:

Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)

Deviations and/or noncompliances were noted during the field placement (refer to remarks below)

Specimen
Pick Up:
1 Sets of concrete specimens/ 6 specimen per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing: Specimen were stored for the initial 24 hours.
Near the poured structure
In an insulated curing box
Other
Remarks: Location: West side of bridge abutment approach slab poured a 5000-psi mix requiring 4000 psi mix. Slump 3.75, temperature air 62 degrees, mix 70 degrees. Break 1 @ 5 days, 1 @ 7 days, 3 @ 28 days and 1 reserve
Technician Signature / DateClyde Smith, October 8, 2026
Reviewer Name / DateKenneth Mosman, October 21, 2026