Skip to content

Density Test Report

Date :11/16/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :11/16/2026 07:30
Onsite Hours :10:00
Name of the Project :Naturewalk PHASE 3, UNIT 4 (formerly called PH 2 Extension) Lots
Project Location :Dallas
Weather :Sunny
Departure Time :11/16/2026 17:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/16/2026 1 14.6 98.8 2025-033 SP 104.0 16.2 95.0 95 D6938 Fail
Location : Backfill at 8" sanitary sewer line between Z 11.9 and Z 11.10, Elv/Depth :-5'
Comment : Gauge Serial No. :91643
11/16/2026 2 14.3 100.1 2025-033 SP 104.0 16.2 96.2 95 D6938 Pass
Location : Same as 1, Elv/Depth :-5'
Comment : Gauge Serial No. :91643
11/16/2026 3 14.9 100.5 2025-033 SP 104.0 16.2 96.6 95 D6938 Pass
Location : Same as 1, Elv/Depth :-3
Comment : Gauge Serial No. :91643
11/16/2026 4 13.1 99.8 2025-033 SP 104.0 16.2 96.0 95 D6938 Pass
Location : Same as 1, Elv/Depth :-3'
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, November 16, 2026