Density Test Report
Date :11/17/2026
Project No :2026C100
Client Company :Artisan
Arrival Time :11/17/2026 07:30
Onsite Hours :9:30
Name of the Project :Naturewalk PHASE 3, UNIT 4 (formerly called PH 2 Extension) Lots
Project Location :Dallas
Weather :sunny
Departure Time :11/17/2026 17:00
ASEC Technician Name :Clyde Smith
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/17/2026 | 1 | 13.7 | 103.1 | 2025-035 SP | 107.8 | 13.0 | 95.6 | 95 | D6938 | Pass |
| Location : | Backfill @ 8" pvc sanitary sewer line between Z 11.10 and Z 11.11, Elv/Depth :-4' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/17/2026 | 2 | 11.8 | 104.6 | 2025-035 SP | 107.8 | 13.0 | 97.0 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-4' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/17/2026 | 3 | 14.2 | 114.1 | 2025-033 SP | 104.0 | 16.2 | 96.1 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-2' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
| 11/17/2026 | 4 | 14.3 | 101.7 | 2025-033 SP | 104.0 | 16.2 | 97.8 | 95 | D6938 | Pass |
| Location : | Same as 1, Elv/Depth :-2' | |||||||||
| Comment : | Gauge Serial No. :91643 | |||||||||
Technician Signature / DateClyde Smith, November 17, 2026