Density Test Report

Date :11/18/2026
Project No :2025C215
Client Company :Artisan
Arrival Time :11/18/2026 07:30
Onsite Hours :05:00
Name of the Project :NW Unit 4 Parkway Ext. Phase 1
Project Location :Dallas
Weather :sunny
Departure Time :11/18/2026 12:30
ASEC Technician Name :Clyde Smith

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/18/2026 1 21.3 93.7 2025-032 SP 94.9 25.0 98.7 98 D6938 Pass
Location : Building lot #1076, Elv/Depth :-1.5'
Comment : Gauge Serial No. :91643
11/18/2026 2 22.9 93.7 2025-032 SP 94.9 25.0 98.7 98 D6938 Pass
Location : Same as 1, Elv/Depth :-1.5'
Comment : Gauge Serial No. :91643
11/18/2026 3 12.6 102.9 2025-033 SP 104.0 16.2 98.9 98 D6938 Pass
Location : Same as 1, Elv/Depth :-6"
Comment : Gauge Serial No. :91643
11/18/2026 4 14.2 102.4 2025-033 SP 104.0 16.2 98.5 98 D6938 Pass
Location : Same as 1, Elv/Depth :-6"
Comment : Gauge Serial No. :91643
Technician Signature / DateClyde Smith, November 18, 2026