Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165 (draft)(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our ASEC representative visited the site to observe the soil conditions for placing pipe. The site soil conditions were observed to be above optimum moisture content levels. Soils were saturated due to heavy rain. The work area is outlined by the red rectangle on the attached drawing. Photos A, B and C highlight the areas of excessive saturation. Contractor mentioned that the placement of backfill around manhole was temporary and that it would be removed when placement of pipe begins to connect to the second manhole.
Upload Images
Image
Description
1
MAP
2
A
3
B
4
C
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel