Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C165 (draft)(Northfield @ Polo Fields - Phase2)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Vidal Shengan (Vidal Shengan)
Observations/Finding
Summary
*
Our AS Engineering and Consulting (ASEC) representative visited the site at the contractor's request to observe the placement of pipe. The contractor was observed connecting manhole D1 to manhole D2 with pipe. The contractor placed additional #57 stone approximately 6" to 8” beneath the pipe as bedding. The pipe was also covered with stone approximately 4 - 6" before starting the first backfill lift. The contractor is using pumps to keep groundwater out of the work area. We observed that the contractor did not place fabric prior to installing manhole D2. We recommended they use filter fabric over all stone prior to backfilling with soil. Due to a unsatisfactory weather day, backfilling was not begun. See attached photos.
Upload Images
Image
Description
1
No fabric below manhole D2
2
Pipe in 57 stone
3
Pipe on up stone 6 to 8"
4
57 stone 6 to 8"
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel