Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. Our representative was present to observe, verify and document the ongoing project activities. During the visit, the following observations were made: The contractor installed 508.38 tons of No. (24) stone over the previously prepared Terragrid layer in the lower half of the basement area G7 within the sump pit. The No. (24) stone was placed according to the job specifications on drawing sheet E720667. <strong>Photo documentation is included below:</strong>
Upload Images
Image
Description
1
As seen from Bakers Creek wall, near sump pit
2
Photographed facing east towards bakers creek wall.
3
Facing south east towards sump pit
4
Sump pit area
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel