Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. During the visit, the following observations were made: 1. Fourteen (14) loads and 360.44 tons of No. 24 stone were delivered and placed in the sump area of the basement. 2. Nine (9) loads and 234.47 tons of riprap were delivered and stored near the southeast corner of the basement in area F6. 3.The No. 24 stone was placed according to the job specification on drawing sheet E720667. <strong>Photo documentation is included below:</strong>
Upload Images
Image
Description
1
Riprap delivered and staged new the south east corner of the basement. Area G6
2
Riprap
3
This is placement of # 24 stone as seen facing bakers creek wall.
4
No. 24 stone placement in sump area
5
No 24 stone being place in the sump area.
1
Add Row
Post Status custom
Validate Email
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel