Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
<span data-preserver-spaces="true">Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the</span> <span data-preserver-spaces="true">request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to</span> <span data-preserver-spaces="true">observe, verify and document the ongoing project activities.</span> <span data-preserver-spaces="true">During the visit, the following observations were made:</span> <ol> <li><span data-preserver-spaces="true">The contractor placed 500 square feet of terrafabric in area F8. </span></li> <li><span data-preserver-spaces="true">One (1) load (26.77 tons) of No. 24 stone was placed atop the textile fabric in area F8. </span></li> </ol> <span data-preserver-spaces="true">Photo documentation and photo locations are included below: </span>
Upload Images
Image
Description
1
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel