Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
<span data-preserver-spaces="true">Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the</span> <span data-preserver-spaces="true">request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to</span> <span data-preserver-spaces="true">observe, verify and document the ongoing project activities.</span> <span data-preserver-spaces="true">During the visit, the following observations were made:</span> <ol> <li><span data-preserver-spaces="true">The contractor received thirty-two loads (32) of silty clay material in area H8 of the basement. </span></li> <li>The contractor visually checked each load and removed any loose organic materials before placement. The organic materials pile is currently located at the base of the ramp.</li> <li><span data-preserver-spaces="true">The clay materials were placed in accordance with ITP-001</span></li> </ol> <span data-preserver-spaces="true">Photo documentation is included below: </span>
Upload Images
Image
Description
1
2
Clay being placed
3
2 foot mark shown on stake
4
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel