Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. During the visit, the following observations were made: <ol> <li>612 Yards (18 loads) of clay materials were received and placed in the basement stationed at a sections H7 and H8.</li> <li>The fill materials were placed and compacted in the basement in compliance with ITP-001.</li> <li>825B and crushed concrete were placed in sections H6 and G6 and compacted using CAT CS54B. The 825B was placed in compliance with ITP-003.</li> </ol> Photo documentation is included below:
Upload Images
Image
Description
1
825B Place and compacted
2
3
Placement of Fill material and compacted using CAT 815 in the basement.
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel