Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. (Reference drawing E720661 S1 - R5 & E720659 S1-R5.) During the visit, the following observations were made: 1.Five hundred fifty-eight (558) square yards of fill material were placed and compacted for the bridge lift in the basement in accordance with ITP-001. 2.The area was hand probed using a 3/8" diameter probe rod during the placement and the probe did not exceed 1.5 inches into the soil. 3.The contractor constructed the slope in area F6 on the west side of the intake canal. The slope area was probed, and no significant rutting or deflection was encountered. 4. The compaction test for the area passed (Please review the attached) 5. Two steel plates were placed over the drainage pipe in area F7. Photo documentation and test locations are attached:
Upload Images
Image
Description
1
2
3
4
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel