Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. (Reference drawing E720661 S1 - R5 & E720659 S1-R5.) During the visit, the following observations were made: 1. Four hundred eighty-six (486) cubic yards of fill material were placed and compacted for the bridge lift in the basement in accordance with ITP-001. 2. The area was probed using a 3/8" diameter probe rod during the placement and the probe did not exceed 1.5 inches into the soil. 3. Seventy-eight point seven-six (78.76) tons of rip-rap was received. 4. The contractor rolled the gravel road and placed additional rip-rap in area H6 (drawing E720659). 5. In area F7, the contractor used a concrete saw to cut a two-inch space on the top edge of the concrete on the north and south side of the trench crossing the road. Two steel one-inch steel plates were placed on the drainage trench. Photo documentation and test locations are attached:
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel