Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
<span data-preserver-spaces="true">AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 - R5, E720659 S1-R5.)</span> <span data-preserver-spaces="true">During the visit, the following observations were made:</span> <ol> <li><span data-preserver-spaces="true">One thousand three hundred sixty-eight (1368) cubic yards of fill material was received and placed in section one of the basement. The materials were placed in general accordance with ITP-001. </span></li> </ol> <span data-preserver-spaces="true">Photo documentation and test locations are attached: </span>
Upload Images
Image
Description
1
Grading operations - spreading fill material and exposing it to facilitate drying.
2
Fabric installed and well secured along the ramp.
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel