Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
<span data-preserver-spaces="true">Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to observe, verify and document the ongoing project activities. (Reference drawing E720661 S1 - R5, E720659 S1-R5.)</span> <span data-preserver-spaces="true">During the visit, the following observations were made:</span> <ol> <li><span data-preserver-spaces="true">One thousand eight hundred and fifty-four (1854) cubic yards of fill materials were received and placed for lift four (4) in section 2 area G7 (drawing E720659) of the basement and lift seven (7) section one (1) area B7 (drawing E720661). The materials were placed in accordance with ITP-001.</span></li> <li><span data-preserver-spaces="true">Five moisture content and density tests were performed in section 1, area B7 (E720661 S1 - R5); the testing locations are shown in purple in the attached drawing. Lift four is highlighted in green and lift seven is highlighted in orange on the attached drawing. </span></li> </ol> Photo documentation and testing locations are attached:
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel