2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
avinash.bandham@asec-na.com (Avinash Bandham)
Observations/Finding
Summary
*
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 - R5, E720659 S1-R5.) During the visit, the following observations were made: <ol> <li>Two hundred and three (203) tons of 825-B crushed stone were placed on the top of the west wall of basement. The materials were placed in accordance with ITP-003, and the fill area is highlighted in brown on the attached drawing.</li> <li>On an account of rain, the placement of the fill material in the basement has been restricted due to excess saturation of the soil made an obstacle for compaction and crew work.</li> </ol>
Upload Images
Image
Description
1
Placement of 825-B crushed stone beside the west wall of the top of the basement.
2
Placement of 825-B crushed stone beside the west wall of the top of the basement.
3
Shaded region shows the placement of crushed 825-B stone.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel