Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
avinash.bandham@asec-na.com (Avinash Bandham)
Observations/Finding
Summary
*
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 - R5, E720659 S1-R5.) During the visit, the following observations were made: <ol> <li style="list-style-type: none"> <ol> <li>Two thousand three hundred and fifty eight (2358) cubic yards of fill materials were placed for lift (10) in section 1 area B7 (drawing E720661) of the basement. The materials were placed and compacted in accordance with ITP-001. The blue highlighted area in the drawing E720661shows the placement of the fill material in the section 1.</li> <li>The edges of the North, East, West and South walls of the section 2 in basement has probed using the hand probe as requested by client Mr. Terry Polena representative of Jacksonville Demolition.</li> </ol> </li> </ol>
Upload Images
Image
Description
1
Placement of Lift-10 in the section-1 basement area B7.
2
Compaction using the roller and dozer.
3
4
5
Loads received and delivered to the site for the placement in section-1.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel