Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C111(DOA Fiber Infrastructure Improvements )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Isaac Davis (Isaac Davis)
Observations/Finding
Summary
*
As requested, our ASEC representative was on site to observe daily activities. The following was observed this day: Density testing for DOA Fiber AVS NS. Location: DOA Fiber AVS NS (North of Economy Parking Exit) Objective: The objective of this report is to provide a summary of the density test conducted at the DOA Fiber AVS NS site. The density test was carried out by Isaac Davis an ASEC technician to assess the compaction and moisture levels of various lifts within the project area. Procedure: <ol> <li>ASEC technician Isaac Davis arrived on site at DOA Fiber AVS NS.</li> <li>BBH contractors completed conduit installation, tying it into the manhole.</li> <li>Density test readings were taken for each lift as described below:</li> </ol> Test Results: Lift #1: <ul> <li>Initial Test Reading: <ul> <li>Wet Density: 118.8 pcf</li> <li>Dry Density: 112.8 pcf</li> <li>Moisture Content: 5.4%</li> <li>Compaction: 91%</li> </ul> </li> <li>Retest Reading: <ul> <li>Wet Density: 121.0 pcf</li> <li>Dry Density: 111.6 pcf</li> <li>Moisture Content: 8.4%</li> <li>Compaction: 90%</li> </ul> </li> </ul> Lift #2: <ul> <li>Wet Density: 125.7 pcf</li> <li>Dry Density: 112.9 pcf</li> <li>Moisture Content: 11.4%</li> <li>Compaction: 91%</li> </ul> Lift #3: <ul> <li>Wet Density: 127.0 pcf</li> <li>Dry Density: 115.1 pcf</li> <li>Moisture Content: 10.3%</li> <li>Compaction: 92.8%</li> </ul> Lift #4: <ul> <li>First Test Reading: <ul> <li>Wet Density: 115.4 pcf</li> <li>Dry Density: 106.8 pcf</li> <li>Moisture Content: 8.0%</li> <li>Compaction: 86.5%</li> </ul> </li> <li>Retest Reading: <ul> <li>Wet Density: 121.9 pcf</li> <li>Dry Density: 112.5 pcf</li> <li>Moisture Content: 8.4%</li> <li>Compaction: 90.7%</li> </ul> </li> </ul> Lift #5: <ul> <li>Wet Density: 122.9 pcf</li> <li>Dry Density: 114.1 pcf</li> <li>Moisture Content: 7.7%</li> <li>Compaction: 92%</li> </ul> Lift #6: <ul> <li>Wet Density: 127.9 pcf</li> <li>Dry Density: 115.1 pcf</li> <li>Moisture Content: 11.0%</li> <li>Compaction: 92.8%</li> </ul> Upon completion of density testing, it was observed that the measured values for all lifts were within the specified limits, indicating satisfactory compaction and moisture levels. The project area at DOA Fiber AVS NS met the required specifications based on the test results.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel