Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C178 (draft)(Ramp 2 Pavement Replacement)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe and the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>Pre-pour observation was performed in the Phase 5 - Lane 2 and Lane 4 portions of the project on this day. Contractor completed rebar and dowel basket placement for these lanes.</li> <li>The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were needed.</li> <li>The contractor cleaned loose rock and debris and standing water from the base.</li> <li>Baskets were found to be level, straight and secured.</li> <li>Dowel bars were found to have epoxy. Embedment length was found to be 15 inches into concrete.</li> <li>Also observed a proof-roll on taxi way 6A. The subgrade appeared to be at finished grade elevation based on information provided. A fully loaded tandem-axled dump truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.</li> </ul> Severe yielding and deflection was not observed during the proof-roll at all areas mentioned above. except a small area (11x17) feet at location Lane 1 in the SE corner. It was recommended to undercut to the depth of 6" and replace it with low slump concrete, <ul> <li>The writer along with Saketh of ATLQA and ATLNext representative Keith Kendal and CWM rep Brandon signed the pre-pour card.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel