Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Gorgas (Ramchandra Mogulla)
Observations/Finding
Summary
*
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Ram Mogulla visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 - R5, E720659 S1-R5.) During the visit, the following observations were made: <ol> <li>One thousand and eighty (1080) cubic yards of fill material were received and placed for lift 14 in section 1 basement area G7 (drawing E720661) of the basement. The materials were placed and compacted in compliance with ITP-001.</li> <li>Three density test and one check plug were performed in section 1 and section 2 basement areas B7 and G7 and the test locations are visible in the attached drawing.</li> </ol> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
Plate tamper compacting the material along the wall.
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel