Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C106(Taxiway 2022 Pavement Replacement )
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor's work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>Milling and proof-roll observation was performed on the taxiway replacement 22, phase 1A.</li> <li>A fully loaded tandem-axled dump truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.</li> <li>Severe yielding and deflection were not observed during the proof-roll at all areas mentioned above. except an area on the north end of lane 1, along to the west edge of the shoulder. It was recommended to undercut to a depth of 6" and replaced with lean concrete.</li> <li>Our representative along with Goerge of ATLQA and the ATLNext representative Kenton observed the proof-roll.</li> </ul>
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel