Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
avinash.bandham@asec-na.com (Avinash Bandham)
Observations/Finding
Summary
*
<strong>Site Visit Observation Report</strong> <strong>Date: 08-21-2023 Site: Plant Gorgas, Parrish, AL Representatives Present:</strong> <ul> <li><strong>Avinash Bandam (ASEC)</strong></li> <li><strong>Josh Kelly (Jackson Demolition)</strong></li> </ul> <strong> </strong> <strong>Purpose of Visit: The site visit was conducted upon the request of Jackson Demolition's representative, Josh Kelly, with the aim to monitor, verify, and document the ongoing project activities at Plant Gorgas in Parrish, AL. The visit was intended to ensure that all construction and engineering activities are conducted in general accordance with established standards and procedures.</strong> <strong>Observations:</strong> <ol> <li><strong>Fill Material Placement:</strong> <ul> <li><strong>A total of 2,628 cubic yards of fill materials were placed for Lift 29, covering both section 2 and the commencement of the next lift in section 1.</strong></li> <li><strong>Section 2 Part 2 Area G7: As per drawing E720659, new fill materials were placed, following procedures specified in ITP-001 in general accordance.</strong></li> <li><strong>Section 1 Basement Area: The placement of new fill materials was extended, maintaining alignment with the general provisions of ITP-001.</strong></li> <li><strong>The designated fill area is clearly highlighted in purple on the attached drawing.</strong></li> </ul> </li> <li><strong>Testing and Verification:</strong> <ul> <li><strong>The probed areas of the site underwent comprehensive testing and verification procedures:</strong> <ul> <li><strong>Section 1 Area B7 (E720661 S1 - R5) and Section 2 Area G8 (E720659 S1-R5): Three moisture density tests were conducted to evaluate moisture content and density. Additionally, a check plug test was executed to ensure compaction levels met industry standards and to verify the Proctor curve for the material used in this lift.</strong></li> </ul> </li> </ul> </li> </ol> <strong>Conclusion: The site visit confirms that the ongoing project activities are conducted in general accordance with established standards and procedures at Plant Gorgas in Parrish, AL. The careful placement and compaction of fill materials, coupled with the diligent testing and verification efforts, further fortified by the check-plug test to confirm the Proctor curve, underscore the commitment to maintaining a superior level of quality.</strong> <strong>Recommendations: Based on the observations made during the visit, no immediate recommendations or corrective actions are required at this stage. However, it is advised to continue the vigilant monitoring of the project's progress and to uphold the practice of regular quality assessments to continue the exemplified standards.</strong> <strong>References:</strong> <ol> <li><strong>Drawing: Reference Drawing E720661 S1 - R5</strong></li> <li><strong>Drawing: Reference Drawing E720659 S1-R5</strong></li> </ol> <strong>For any further inquiries or clarifications, please feel free to contact us and we will be more than happy to discuss it with you.</strong>
Upload Images
Image
Description
1
Highlighted region depicts placement of fill material section 2 part 2
2
Highlighted region depicts placement of fill material section 1
3
Placement of fill materials in section 1
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel