Daily Field Report
Density test report
Date
*
Project Number
*
2022C235 (draft)(Plant Gorgas Demolition and Grading)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
avinash.bandham@asec-na.com (Avinash Bandham)
Observations/Finding
Summary
*
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.) During the visit, the following observations were made: <ol> <li>Two thousand nine hundred and eighty-eight (2988) cubic yards of fill materials were received for lift (9) in section 1 basement area B7 (E720661 S1-R8) and for lift (9) in section 2 basement are G7(E720659 S1-R8). The materials were placed and compacted in accordance with ITP-001, and the fill area is highlighted in brown as depicted in the attached drawing.</li> <li>Started and placed structural fill materials in the section 2 basement area G7 (E720659 S1-R8) for lift (10).</li> <li>The basement area was probed using the hand probe and three moisture density test were performed in the basement followed with a check-plug to verify Proctor curve application. The test locations were marked on the enclosed drawing.</li> </ol> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
The highlighted region depicts the placement of structural fill material in section 2
2
Placement of structural fill materials in section 2 part 1
3
Placement of structural fill material in the section 2 part 2
4
Placed the structural fill materials in section 1 and and section 2 part 1
5
Placed the structural fill materials in section 1 and and section 2 part 1
6
Placed the structural fill materials in section 1 and and section 2 part 1
7
Placed the structural fill material in section 1
8
Placed the structural fill material in section 1
9
Hauling in the section 2
10
Hauling in the section 2
11
12
13
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel