Density test report
Date
*
Project Number
*
2023C136 (draft)(Big Creek Boardwalks)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
asec (Ramchandra Mogulla)
Observations/Finding
Summary
*
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Ram Mogulla visited the site at the request of Excellere Construction representative Martha Herrera. The undersigned representative was present to verify bolted connections that were installed along the Main line section of the project between Bent 29 and the concrete abutment closest to Bent 31. During the visit, the following observations were made: <ol> <li><strong>Bolted Connections:</strong> <ul> <li>Inspected bolted connections at the designated locations for adherence to specific criteria, including bearing, bolt placement, and complete nut engagement.</li> <li>Verified that the bolted connections within the area inspected as mentioned above appeared to be acceptable and are in general accordance with the relevant AISC/RCSC code requirements as well as the project specifications for snug-tight conditions.</li> </ul> </li> </ol> <ol> <li><strong>Beam-Column Moment Connection Inspection:</strong></li> </ol> <ol> <li style="list-style-type: none"> <ul> <li>Examined bolted beam to column moment connections within the inspection area as mentioned above.</li> <li>Verified the fastener assemblies within these bolted beam connections to ensure alignment with contract requirements pertaining to size, components, assembly order, and orientation.</li> <li>Confirmed that the fastener assemblies exhibit a snug-tight condition, consistent with the project drawings.</li> </ul> </li> </ol> <strong>Conclusion:</strong> The site visit conducted on September 12, 2023, provided an assessment of ongoing project activities for the Big Creek Board Walk. The observations made during the visit attest to the compliance of bolted connections for snug-tight conditions with relevant industry standards. If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have.
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel