Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C207(CME Church Education Center)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<span style="font-family: arial, helvetica, sans-serif">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to verify compliance with project drawing/specifications, </span><span style="font-family: arial, helvetica, sans-serif">applicable codes, and materials submittals. The following observations were observed on site this day.</span> <span style="font-family: arial, helvetica, sans-serif">The placement and compaction of backfill (GAB) and inspection of footings continued this day.</span> <span style="font-family: arial, helvetica, sans-serif">At the time of arrival, the contractor had already compacted GAB, however, the footing hadn't achieved finished grade. Reinforcing steel for the footing had been installed on top of the GAB as shown in the attached photos. Our representative recommended this area be fixed and re-evaluated prior to concrete placement.</span> <span style="font-family: arial, helvetica, sans-serif">Density test results indicate that the compacted materials did not meet the project requirement of 90% for the lot.</span>
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel