Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C195(Kimbal Bridge Tract)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vidal.dias@asec-na.com (Vidal Dias)
Observations/Finding
Summary
*
The undersigned ASEC representative was on-site as requested by the Client to observe fill placement outside the building pads on Lots #1-3 and the preparation of areas behind the building pads on Lots #5 & 6. <strong>Observations at Lots #1, 2, & 3:</strong> The areas highlighted in yellow on the project drawings, located behind the building pads of Lots #1, 2, and 3, were observed for the placement of excess topsoil. The soil in these areas is primarily composed of red and tan silty fine to medium sands with clay. Excavation depths varied, with approximately 15 feet behind Lot #1 and 20 feet behind Lot #3. The process of spreading and compacting fill materials was observed for stability and uniformity. <strong>Preparation at Lots #5 & 6:</strong> Additionally, areas behind the building pads of Lots #5 and 6, indicated in green on the project drawings, are being prepared for the placement of additional fill. This involves grading and preliminary compaction to establish a suitable base for fill placement. If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have.
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel