Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2022C205(Enclave at Parkway Village)
Name of the Project
*
Project Location
*
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Isaac Davis (Isaac Davis)
Observations/Finding
Summary
*
Our AS Engineering & Consulting, LLC representative was on site to perform a foundation bearing inspection for the following lot footings: Parkside, Lot Numbers #122, #123, and #124 <strong>Lot #122:</strong> <ul> <li><em>H1F (NW)</em> <ul> <li><em>FT1:</em> Light brown/red sandy silt micaceous rocky, blows = 11.</li> <li><em>FT2:</em> AR - rock = 1ft 8in, offset AR - rock = 1ft 6in, offset AR = rock 10in.</li> </ul> </li> <li><em>H2B (SE)</em> <ul> <li><em>FT1:</em> AR - rock = 6in, offset AR - rock = 11in, offset light brown/white sandy silt micaceous = 15+ blows.</li> <li><em>FT2:</em> AR - rock = 1ft 3in, offset AR - rock = 4in.</li> <li><em>Probing:</em> Used 3/8" diameter probe rod. Sections on top exhibited soft areas between rocky sections (approximately 4 to 5 inches).</li> </ul> </li> </ul> <strong>Lot #123:</strong> <ul> <li><em>H1F (NW)</em> <ul> <li><em>FT1:</em> AR - rock = 4in, offset AR - rock = 9in, offset AR - rock = 6in, offset AR - 11in.</li> </ul> </li> <li><em>H2B (SE)</em> <ul> <li><em>FT1:</em> Light brown/red sandy silt micaceous, rocky - 15+ blows.</li> <li><em>FT2:</em> AR - rock = 1ft 5in, offset AR - rock = 11in, offset AR - rock = 6inches.</li> </ul> </li> </ul> <strong>Lot #124:</strong> <ul> <li><em>H1F (NW)</em> <ul> <li><em>FT1:</em> AR - rock = 10in, offset AR - rock = 6in, offset AR - rock = 11in.</li> </ul> </li> <li><em>H2B (SE)</em> <ul> <li><em>FT1:</em> Light brown sandy silt micaceous - 8 blows.</li> <li><em>FT2:</em> Light brown/grey/red sandy silt micaceous - 11 blows.</li> <li><em>FT3:</em> AR - rock = 2ft 9in, offset AR - rock = 10in.</li> </ul> </li> </ul> <em>Additional Information:</em> <ul> <li><em>Rebar and Wire Mesh:</em> After the second inspection, both were found to meet job specifications for size, spacing & quantity.</li> <li>Informed Austin after the second inspection to demuck and drain out the standing water in the footing due to rain. No confirmation of the issue being completed has been received.</li> </ul>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
Add Row
Post Status custom
Validate Email
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel