Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor's work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift: <ul> <li>Pre-pour observation performed for phase 1, south cargo on this day. Contractor completed rebar and dowel basket placement for these lanes.</li> <li>The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were needed.</li> <li>The contractor cleaned loose rock and debris and standing water from the base.</li> <li>Baskets were found to be level, straight and secured.</li> <li>Dowel bars were found to have epoxy. Embedment length was found to be 15 inches into concrete.</li> <li>The writer along with Saleem of ATLQA and ATLNext representative Miller Barry and CWM rep Brandon signed the pre-pour card.</li> <li>Probe rod testing was performed at the water pipe trench for bearing capacity at location (End around Taxi way, Band 29 STA 7021+21.42 & Bend 30 STA 7021+32.82) along Crosswind Rd. The results showed that the subgrade at the test locations appeared to be capable of supporting a net allowable bearing pressure of 3000 psf,</li> </ul> In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel